Welcome: HANGZHOU RELIABLE CABLE INDUSTRY CO.,LTD
JAMES@RCICABLE.COM +86 0571-87961814

105℃ Silane crosslinked Polyolefin Elastomer Cable Insulation Material (up to 3KV)

105℃ Silane crosslinked Polyolefin Elastomer Cable Insulation Material (up to 3KV)
has excellent processing performance,mechanical properties and insulating
properties.It is soft and elastic, suit for the insulation of cables up to 3kV.

EMAIL

           105℃ Silane crosslinked Polyolefin Elastomer Cable Insulation Material (up to 3KV)

Item code:   RCI-5080E

Description:

RCI-5080E has excellent processing performance,mechanical properties and insulating properties.It is soft and elastic, suit for the insulation of cables up to 3kV.


Specification Sheet:

ec7f0b78-bcda-43b9-8f1f-5362db6c71eb.png

Remark: The typical value is test by company which can’t be as a judge on the basis of actual. The actual value should be debugged according to the product specification and production equipment to play the best performance.

Processing Techniques:

Extruding techniques Ensure that the screw and barrel of the extruder are cleaned. Mix the large package (Component A ) and the small package (Component B) evenly.

Component A:Component B is 95 : 5 in weight

The material must be use up within 2 hours after unpacking.(It can’t be dried.) avoid to bring the external water during the process.


Extrusion Temperature:


c6722535-8b86-4100-b3f8-bce67b01f7e2.png

Screw Type:PVC screw Compression Ratio: 3.0 + 0.3

Pay-offSpeed:Without the effect of smoothness and performance,the faster,the better



   Cross-linking:

  Natural Cross-link: Temperature 15-25℃, cross-link will be finished around 7days When temperature is higher than 25℃, cross-link will be finished around 3 days. Water bath or Steam: Control the temperature around 60℃, cross-link will finished about 4hours. (the thickness of the test piece is 1mm) Full performance test, water bath (steam) 60℃, more than 8hours, ensure the material is fully cross-linked.


Package, Transport and Storage


Package:Vacuum packed by aluminium foil bag

Transport:Can’t be exposed to the sun or rain, or suffer mechanical damage. Storage: Should be stacked on the pallet in a clean, dry and ventilated warehouse.

Shelf Life:12 months.            

                        





INQUIRY